I have been doing a little bit of digging I have dug out all the gravel from the footings and now have to dig into the soil. It took me about a day to dig out all the gravel and the picture show the result of half an hour of digging in to the soil. I sill have to dig down another 100mm to get to the right level. I think that I will be getting somone with a small digger in to do the rest as it is very slow going and would take me till the middle of next year to do the entire building.
Friday, January 12, 2007
I have been doing a little bit of digging I have dug out all the gravel from the footings and now have to dig into the soil. It took me about a day to dig out all the gravel and the picture show the result of half an hour of digging in to the soil. I sill have to dig down another 100mm to get to the right level. I think that I will be getting somone with a small digger in to do the rest as it is very slow going and would take me till the middle of next year to do the entire building.